Tarlac City, Tarlac
Prefabricated Structures Jun 23, 2026 1 min read

Tarlac City, Tarlac

An existing facility upgraded for higher throughput and longer asset life. Ventilation, space utilization, and workflow were re-engineered without sacrificing manual harvest flexibility.

Project Specifications

Product
Broiler Multi-Tier
Building Type
Conversion – Manual Harvest
No. of Buildings
5
Dimension
150m x 16m
Capacity
100,224 birds per building